The first moon mission of 2024 failed. Here's why.

Most lunar landers won't make the journey.
 By 
Elisha Sauers
 on 
Peregrine moon lander separating from rocket
Shortly after Astrobotic Technologies' spacecraft became fully operational in space, Peregrine (shown here separated from a rocket's Centaur V upper stage) suffered a serious propulsion problem causing a critical loss of fuel. Credit: United Launch Alliance

The first U.S.-based robotic lander in over a half-century lost its shot at the moon just mere hours into flight.

Pittsburgh-based space robotics company Astrobotic Technologies launched its spacecraft atop a new rocket from Cape Canaveral, Florida, at 2:18 a.m. ET on Jan. 8, in an attempt to be the first company to touch down on the moon. Its lander, named Peregrine after the world's fastest bird, was packed with five NASA payloads among other nations' and commercial customers' cargo.

United Launch Alliance's new Vulcan rocket performed its job without incident for its inaugural voyage. But shortly after the spacecraft became fully operational, Peregrine suffered a serious propulsion problem, unable to point its solar panels at the sun for power. Mission controllers were eventually able to fix Peregrine's orientation, but the propulsion issue caused a critical loss of fuel, rendering much of the journey dead on arrival.


You May Also Like

UPDATE: Jan. 9, 2024, 9:46 a.m. EST In a late-night update about the mission, Astrobotic said Monday, Jan. 8, that the ongoing leak is causing Peregrine's compass system to work overtime to keep the spacecraft from tumbling out of control. They estimated Peregrine would run out of fuel in less than two days.

"At this time, the goal is to get Peregrine as close to lunar distance as we can before it loses the ability to maintain its sun-pointing position and subsequently loses power," Astrobotic said on X, formerly Twitter.

Astrobotic was set to be the first contractor to make the 250,000-mile trek through NASA's Commercial Lunar Payload Services initiative, a private sector recruitment program to support the U.S. space agency's lunar ambitions. Through several contracts, NASA wants to establish a regular cadence of moon missions to prepare for sending Artemis astronauts back to the moon.

In the new commercial Space Age, failures are not to be unexpected. Though the first uncrewed moon landing happened 60 years ago, getting to the moon and landing is still onerous, with less than half of all missions succeeding. The lunar surface is a veritable graveyard of robotic landers and rovers that didn't fulfill their purposes. For those spacecraft that actually reach lunar orbit, it's still difficult to touch down. The moon's atmosphere is very thin, providing virtually no drag to slow a lander down as it approaches the ground. Furthermore, there are no GPS systems on the moon to help guide a craft to its landing spot.

Thomas Zurbuchen, NASA's former head of science, once described each of these first CLPS endeavors as "taking a shot on goal." The sports analogy means not every attempt will be a victory, but overall the program will help NASA achieve its moon-to-Mars aspirations. By outsourcing NASA's lunar deliveries — rather than owning each mission end-to-end — the agency believes it will save money.

The Peregrine mission cost NASA $108 million.

"Today, we don't know how many of the early attempts will be successful," said Joel Kearns, NASA science's deputy associate administrator for exploration, during a news conference in November. "But I can tell you that these American companies are technically strong and rigorous, savvy, they're resourceful, and they're driven to be successful. They want to secure that first mover advantage in generating this new lunar economy."

Several other nations and private companies have recently set their sights on the moon, particularly its south pole, because scientists believe ice is buried in permanently shadowed craters there. The natural resource is coveted because it could supply drinking water, oxygen, and rocket fuel for future missions, ushering a new era in spaceflight.

Next, the Japanese space agency will try to put a lander on the lunar surface. JAXA's spacecraft has been orbiting the moon since Christmas. Its SLIM mission, short for Smart Lander for Investigating the Moon, is expected to touch down near Shioli crater on the moon's near side on Jan. 20.

Astrobotic is expected to deliver NASA's VIPER mission, an ice-mining rover, to the moon later this year. It's not clear how this preceding mission's mishap will impact those plans.

Topics NASA

Mashable Image
Elisha Sauers

Elisha Sauers writes about space for Mashable, taking deep dives into NASA's moon and Mars missions, chatting up astronauts and history-making discoverers, and jetting above the clouds. Through 17 years of reporting, she's covered a variety of topics, including health, business, and government, with a penchant for public records requests. She previously worked for The Virginian-Pilot in Norfolk, Virginia, and The Capital in Annapolis, Maryland. Her work has earned numerous state awards, including the Virginia Press Association's top honor, Best in Show, and national recognition for narrative storytelling. For each year she has covered space, Sauers has won National Headliner Awards, including first place for her Sex in Space series. Send space tips and story ideas to [email protected] or text 443-684-2489. Follow her on X at @elishasauers.

Mashable Potato

Recommended For You
Artemis II launches its historic moon mission: See the launch and mission details
Artemis II lifts off

Moon phase today: What the moon will look like on January 4
An image of a full moon.


Moon phase today: What the Moon will look like on January 6
An image of a full moon.

Moon phase today: What the Moon will look like on January 10
An image of a full moon.

More in Science
California just launched the country's largest public broadband network
Newsom stands behind a teen on a computer. A group of people cheer and clap behind them.

The Shark FlexStyle is our favorite Dyson Airwrap dupe, and it's $160 off at Amazon right now
The Shark FlexStyle Air Styling & Drying System against a colorful background.

Amazon's sister site is having a one-day sale, and this Bissell TurboClean deal is too good to skip
A woman using the Bissell TurboClean Cordless Hard Floor Cleaner Mop and Lightweight Wet/Dry Vacuum.

The best smartwatch you've never heard of is on sale for less than $50
Nothing CMF Watch 3 Pro in light green with blue and green abstract background

Reddit r/all takes another step into the grave
Reddit logo on phone screen

Trending on Mashable
NYT Connections hints today: Clues, answers for April 3, 2026
Connections game on a smartphone

Wordle today: Answer, hints for April 3, 2026
Wordle game on a smartphone

Google launches Gemma 4, a new open-source model: How to try it
Google Gemma

What's new to streaming this week? (April 3, 2026)
A composite of images from film and TV streaming this week.

NYT Strands hints, answers for April 3, 2026
A game being played on a smartphone.
The biggest stories of the day delivered to your inbox.
These newsletters may contain advertising, deals, or affiliate links. By clicking Subscribe, you confirm you are 16+ and agree to our Terms of Use and Privacy Policy.
Thanks for signing up. See you at your inbox!