NASA aims to land on the moon in 2 years. Why that won't happen.

Returning astronauts to the moon isn't easy.
 By 
Mark Kaufman
 on 
A conception of two NASA Artemis mission astronauts on the moon.
A conception of two NASA Artemis mission astronauts on the moon. Credit: NASA

After an over 50-year absence, NASA astronauts will return to the moon — just not as soon as the space agency hopes.

NASA's 21st-century moon ambitions — a program called Artemis wherein the U.S. plans to establish a permanent lunar presence — have been scrutinized by the U.S. Government Accountability Office (GOA). A new report, issued on Nov. 28, determined that while the agency has made important strides in returning astronauts to the lunar surface, it's unlikely to achieve its late 2025 landing goal (a mission called Artemis III).

Big NASA missions usually take over six and a half years to develop. A 2025 launch would beat this average. Yet the new moon exploration mission, a complex operation involving a new lunar lander and space suits — both subject to the rigid safety requirements of human spaceflight — almost certainly won't complete all their critical design, fabrication, and testing ahead of time.


You May Also Like

"The complexity of human spaceflight suggests that it is unrealistic to expect the program to complete development more than a year faster than the average for NASA major projects, the majority of which are not human spaceflight projects," the office determined. "GAO found that if development took as long as the average for NASA major projects, the Artemis III mission would likely occur in early 2027."

Artemis III is an elaborate endeavor. Astronauts will launch on NASA's new megarocket — the Space Launch System, which the agency successfully tested, with no crew, in November 2022. The giant rocket will lift the Orion spacecraft into space, which will be the astronauts' ride to and from the moon's orbit. Astronauts will then transfer to a SpaceX Starship craft that will land astronauts on the moon's resource-rich south pole, where they will spend nearly a week before Starship launches them back up to lunar orbit. After transferring back to Orion, the astronauts will burn their engines and return home, ultimately splashing down in the Pacific Ocean.

Why NASA's moon mission will be delayed

The GOA outlines two primary reasons why it expects Artemis III to reach the moon in 2027, as opposed to 2025: Delays in the lunar lander and new space suit designs. For those in the spaceflight industry, this delay might seem unsurprising, given that the Artemis III moon lander doesn't yet exist.

Human landing system delay

NASA hired SpaceX to land astronauts on the moon, a $2.89 billion contract. SpaceX, however, has much work to do on its human landing system (HLS).

The SpaceX Starship lander, and the large propellant tankers that will fuel it, are dependent on the successful design and testing of the Starship spacecraft and rocket. As of Dec. 2023, SpaceX has launched two Starship demonstrations, which showed progress but didn't nearly complete missions in Earth's orbit. In November, the booster exploded during its second flight test. The commerical space company has yet to complete a successful orbital flight test.

An artist's conception of the SpaceX Starship human lander design.
An artist's conception of the SpaceX Starship human lander design. Credit: SpaceX

These are expected results of novel rocket tests as SpaceX refines its colossal Starship (with its booster, Starship reaches nearly 400 feet high). But this likely means Artemis delays. The GOA noted that eight of 13 "key events" for the landing system had already been delayed by six months or more.

And another ambitious space infrastructure project looms large: SpaceX needs to build and launch the tanker system that will provide fuel to its moon lander. "A critical aspect of SpaceX’s plan for landing astronauts on the moon for Artemis III is launching multiple tankers that will transfer propellant to a depot in space before transferring that propellant to the human landing system," the GOA concluded. "NASA documentation states that SpaceX has made limited progress maturing the technologies needed to support this aspect of its plan."

New space suit delays

NASA hired Axiom Space to make new spacesuits for the agency's 21st-century ambitions to the Moon, and then one day, Mars.

The spacesuit will feature "the range of motion and flexibility needed to explore more of the lunar landscape, and the suit will fit a broad range of crew members, accommodating at least 90 percent of the US male and female population," NASA explained. "Axiom Space will continue to apply modern technological innovations in life support systems, pressure garments, and avionics as development continues."

The Artemis III Axiom spacesuit prototype.
The Artemis III Axiom spacesuit prototype. Credit: Axiom Space

Want more science and tech news delivered straight to your inbox? Sign up for Mashable's Light Speed newsletter today.

These suits, however, still need a lot of work. "For example, NASA’s original design did not provide the minimum amount of emergency life support needed for the Artemis III mission," the GOA wrote. "As a result, Axiom representatives said they may redesign certain aspects of the space suit, which could delay its delivery for the mission." As the report details, the suits might not complete the crucial "Flight Readiness Review" until late 2025.

Topics NASA

Mashable Image
Mark Kaufman
Science Editor

Mark was the science editor at Mashable. After working as a ranger with the National Park Service, he started a reporting career after seeing the extraordinary value in educating people about the happenings on Earth, and beyond.

He's descended 2,500 feet into the ocean depths in search of the sixgill shark, ventured into the halls of top R&D laboratories, and interviewed some of the most fascinating scientists in the world.

Mashable Potato

Recommended For You
NASA no longer plans to land on the moon in the next Artemis mission
NASA astronaut John Young moonwalking in 1972

NASA is all but certain it won't fly to the moon in March for good reason
Rolling the Space Launch System rocket to the launch pad

Moon phase today: What the moon will look like on January 4
An image of a full moon.


Moon phase today: What the Moon will look like on January 6
An image of a full moon.

More in Science
How to watch Chelsea vs. Port Vale online for free
Alejandro Garnacho of Chelsea reacts

How to watch 'Wuthering Heights' at home: Margot Robbie and Jacob Elordi's controversial romance now streaming
Margot Robbie and Jacob Elordi embracing in still from "Wuthering Heights"

How to watch New York Islanders vs. Philadelphia Flyers online for free
Matthew Schaefer of the New York Islanders warms up

How to watch Mexico vs. Belgium online for free
Israel Reyes of Mexico reacts

How to watch Brazil vs. Croatia online for free
Vinicius Junior #10 of Brazil leaves

Trending on Mashable
NYT Connections hints today: Clues, answers for April 3, 2026
Connections game on a smartphone

Wordle today: Answer, hints for April 3, 2026
Wordle game on a smartphone


What's new to streaming this week? (April 3, 2026)
A composite of images from film and TV streaming this week.

NYT Connections hints today: Clues, answers for April 2, 2026
Connections game on a smartphone
The biggest stories of the day delivered to your inbox.
These newsletters may contain advertising, deals, or affiliate links. By clicking Subscribe, you confirm you are 16+ and agree to our Terms of Use and Privacy Policy.
Thanks for signing up. See you at your inbox!